![]() ![]() ![]() Additionally, the cubic yards of dredge have been reduced from 15,364 cubic yards to 3,295 cubic yards since the original public notice, issued 25 August 2022. *Note, the 2,045 cubic yard rock pad that was originally proposed has been removed from the project scope. A typical 10-foot by 20-foot well protector platform will be constructed upon successful completion of the well. All dredge material will be hauled off via barge and placed within Adloy dredge material placement area (DMPA).Īdditionally, thirteen 5-pile clusters will be installed around the slip for drilling barge stabilization. Approximately 3,295 cubic yards of dredge material will be excavated and hauled offsite. Dredging will be conducted to -7-foot mean lower low water (MLLW). The access route and proposed slip dredge footprint will be approximately 241,340 total square foot. The applicant proposes to mechanically dredge an access route and a slip approximately 241 feet north of the Houston Ship Channel within Scott Bay. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |